Historical Timeline

September 1896

Grand Haven electric utility is created – Grand Haven’s electric utility was created on September 29, 1896, when citizens voted to approve a $10,000 bond for the first municipal electrical generator.

1911

Net book Value – The utility was appraised at a net book value of $25,244.33. Additional equipment was added as needed.

1915

Steam engine replaced – The original steam engine is replaced by a 500kw turbine and other additions are made.